XENON100 Photo Gallery
Oct 2007: First XENON100 Collaboration meeting
Nov 2007: K.L. Giboni
(Columbia), F. Arneodo (LNGS) and E. Aprile (Columbia)
Nov 2007: Outer Chamber
Nov 2007: K.L. Giboni (Columbia)
Nov 2007: Inside of PTR
(Pulse Tube Refrigerator)
Nov 2007: E. Aprile (Columbia)
Nov 2007: G. Plante (Columbia)
Nov 2007: G. Plante (Columbia)
Nov 2007: P. Shagin (Rice)
Nov 2007: PTR (Pulse Tube Refrigerator)
Dec 2007: E. Aprile (Columbia) checking gas system
Dec 2007: E. Aprile and M. Yamashita (Columbia)
Dec 2007: B. Choi, K.E. Lim (Columbia), L. Coelho (Coimbra). E. Aprile, M. Yamashita, R. Santorelli (Columbia)
Dec 2007: K.E. Lim, B. Choi (Columbia)
Dec 2007: E. Aprile, K.L. Giboni and G. Plante (Columbia)
Dec 2007: G. Plante (Columbia), Y. Mei (Rice) and K.L. Giboni (Columbia)
Dec 2007: K.L. Giboni (Columbia) working with PTR
Dec 2007: Assembled PTR
Dec 2007: K.L. Giboni (Columbia)
Dec 2007: G. Plante (Columbia) and A.D. Ferella (Zurich)
Dec 2007: E. Aprile (Columbia)
Dec 2007: LNGS
Dec 2007: G. Plante, B. Choi and E. Aprile (Columbia)
Dec 2007: The Columbia Group Aboveground: E. Aprile, R. Santorelli, K.E. Lim, G. Plante
Dec 2007: The Rice Group Aboveground: M. Schumann, U. Oberlack, P. Shagin
Jan 2008: XENON100 Collaboration at LNGS
Jan 2008: M. Schumann (Rice), L. Coelho (Coimbra) and behind ghost is G. Plante (Columbia)
Jan 2008: M. Schumann (Rice), L. Fernandes (Coimbra), A. Kish (Zurich) and L. Coelho (Coimbra)
Jan 2008: E. Tziaferi (Zurich), E. Aprile and B. Choi (Columbia)
Jan 2008: XENON100 Assembly
Jan 2007: K.E. Lim (Columbia) stripping cable for PMT signal
Feb 2008: M. Schumann (Rice), E. Tziaferi (Zurich) working with TPC
Feb 2008: A. Kish (Zurich) with TPC
Feb 2008: K.E. Lim (Columbia) with Bottom PMT Array
Feb 2008: G. Plante (Columbia), M. Schumann (Rice) working with Burndy pins
Feb 2008: 2 AM, finally last burndy pin was done!!!!
Feb 2008: R. Santorelli (Zurich), G. Plante (Columbia). S. Fattori (LNGS) and E. Tziaferi (Zurich)
Feb 2008: Y. Mei (Rice) working with resistors
Feb 2008: Top PMT Array with Bell
Feb 2008: Top PMT Array
Feb 2008: Top Veto PMTs
Feb 2008: Bot Veto PMTs
Feb 2008: Assembled TPC
Feb 2008: A.D. Ferella (Zurich) and F. Arneodo (LNGS)
Feb 2008: Loading XENON100 to move Underground
Feb 2008: XENON100 moving day at LNGS
Feb 2008: Moving XENON100 to Underground
Feb 2008: Lowering XENON100 Underground
Feb 2008: The Rice Group Underground: Y. Mei and M. Schumann
Feb 2008: The Zurich Group Underground: A. Kish, E. Tziaferi, A.D. Ferella, A. Askin and R. Santorelli
Feb 2008: K.E. Lim (Columbia) with XENON100 Cooling Tower
Feb 2008: L. Baudis (Zurich), E. Aprile (Columbia)
Apr 2008: K.L. Giboni (Columbia), K. Arisaka (UCLA), H. Wang (UCLA) discussing about XENON detector
Apr 2008: Collaboration meeting
Apr 2008: J.A.M. Lopes and J. Santos (Coimbra) during the collaboration meeting
Apr 2008: J.A.M. Lopes (Coimbra) and K. Arisaka (UCLA) discussing about XENON experiment
Apr 2008: E. Aprile (Columbia) is presenting XENON100 status at LNGS
Apr 2008: K.E. Lim (Columbia), U. Oberlack (Rice), M. Schumann (Rice) and E. Brown (UCLA) Underground
Apr 2008: R. Santorelli (Zurich) is calibrating PMTS
Apr 2008: R. Santorelli, A.D. Ferella (Zurich) and M. Schumann (Rice) are taking data
Apr 2008: A.D. Ferella (Zurich) is filling Liquid Nitrogen
Apr 2008: K. Ni (Columbia) in Xenon Box
May 2008: E. Aprile (Columbia) and K. Arisaka (UCLA)
May 2008: XENON100 DAQ
May 2008: M. Schumann and Y. Mei (Rice)
May 2008: Top Meshes
May 2008: E. Brown (UCLA), G. Plante (Columbia) fixing PMTs
May 2008: G. Plante (Columbia), M. Schumann (Rice) adding resistors
May 2008: E. Brown (UCLA) checking resistance of burndy connector
May 2008: XENON100 Porcupine Feedthroughs
May 2008: G. Plante (Columbia) arranging PMTs
May 2008: Bottom PMTs Array
May 2008: Bottom PMTs Array with Top PMTs images
May 2008: Reflected Top PMTs array on Bottom PMTs
May 2008: Top PMTs
May 2008: R. Santorelli
(Zurich), B. Choi, K.E. Lim (Columbia), E. Brown (UCLA), G. Plante, M. Schumann
May 2008: E. Aprile (Columbia) with XENON100
May 2008: E. Aprile (Columbia) with a new mesh
May 2008: E. Aprile (Columbia) in the shield
May 2008: Lowering XENON100, E. Brown (UCLA)
May 2008: Lowering XENON100, R. Santorelli (Zurich), E. Aprile, G. Plante (Columbia)
May 2008: XENON Box is always crowded during the installation
Jul 2008: K.L. Giboni (Columbia)
Jul 2008: M. Schumann (Rice) fixing optical fiber
Jul 2008: K.L. Giboni (Columbia) fixing resistors
Jul 2008: E. Aprile (Columbia) examining resistors
Jul 2008: K.L. Giboni, G. Plante (Columbia)
Jul 2008: After installation, M. Schumann (Rice) , E. Aprile, G. Plante (Columbia)
Jul 2008: E. Aprile (Columbia) cooling down with Liquid Nitrogen
Jul 2008: Collaboration meeting